Angin kencang yang mengakibatkan beberapa tiang listrik miring

Not even a month after the installation, strong winds have hit, which claims that several poles in the mountains are tilted badly, whi...

lea12

87.34
PeakD

memperbaiki beberapa kerusakan dan pemasangan barang baru arus listrik

today we feel very happy because we get a job back in the cold city (takengon) aceh. today we work like normal days where in a day we c...

lea12

87.34
PeakD

installation of new concrete piles with lots of cable connections

lives, broken bones, are not an obstacle for us to work professionally, that's what we had in mind before doing this kind of work, but ...

lea12

87.34
PeakD

plug in the power outlet

Installation of contact stock cables in buildings that have just been built, in the world of electricity, jobs like this are very easy a...

lea12

87.34
PeakD

Penting nya Membersihkan box meteran

It is important to take care of the meter box made of iron. His current job at one of the headquarters is to clean all the high-voltage...

lea12

87.34
PeakD

installation of a 6watt 220volt meter, in a new building

friends at work to install a meter in a new shop that has a voltage of 220 volts, because for 5 days my team has no work outside th...

lea12

87.34
PeakD

installation of a new transformer which was attended directly by the head of the office

the hardest and most awaited job, work like this is indeed very difficult, but this is what all field officers have been waiting for, in...

lea12

87.34
PeakD

completing several different tasks in one day and receiving a new transformer

My hardworking greetings to all of you I feel dizzy when I think about yesterday's work, where in a day we have to complete different jo...

lea12

87.34
PeakD

remove the iron poles that have started to rust and replace them with concrete poles

so unemployment is dizzy, a lot of work like this is dizzy, is this what life is?. hello all tech friends!! how do you guys do this fi...

lea12

87.34
PeakD

wiring from street utility poles to new buildings

today there is bad news, where is it better to work in the city of Takengon or a cold city, suddenly instead of being assigned to the ci...

lea12

87.34
PeakD

repair and installation of high-voltage electricity meters

Today our work is very different from the beginning, which is usually we are always given direction by our field leader, but today our c...

lea12

87.34
PeakD

ways that must be learned for the installation of electric current in new buildings

The following items are needed in the installation of a new electric current Before installing a new electrical installation, you must p...

lea12

87.34
PeakD

3 FASA MCB installation process. in the city area of ​​lhokseumawere

today we were assigned to install 3 PHASE MCB (installation of 3 PHASE electrical panels). in the Lhokseumawe city area. How to install ...

lea12

87.34
PeakD

meyeran inspection at the regent's office

this time my team and I got a call from the regent's office, the electrician said there was an abnormal meter by issuing several speci...