https://files.peakd.com/file/peakd-hive/lea12/23yd7s2Wd4DPpxkC4NrsGtsBnZoyxEXaditg43748QkmFoPnjrCEfSH5NaTDjYFSKymGX.jpg

tonight I will tell you a little about my work today and the connection from yesterday's post, where it has been almost three days we have to master the road to the city of Takengon or the cold city of Aceh.

where today we are on duty the same as a few days ago but only in different field points.

our task today is dismantling the iron poles that have started to rust and replacing them with concrete poles, installing motorized LBS, and replacing old cables.

In the photo above, we are dismantling all the components on the used pole so that when we get into the truck it doesn't take up a lot of space.

at the same time we eat lunch because it's time to eat, maybe it's different from the break time where you work, we don't really take a break during the break but we also do work that we can do while resting, such as dismantling the components on the poles lowered.

https://files.peakd.com/file/peakd-hive/lea12/23v4Xg3AdDFqnh2QYXvR3wJCHJaNyNwcg4Ltwmw8ZECBogSbNU5NY73sN3Bim7U9gED3A.jpg

https://files.peakd.com/file/peakd-hive/lea12/241ZnBvt3Jg7krpJCc5Nw4GfmTnTNP5ABSDf5KnpAAQp2zBmWFeLJmJJmg8XN5ERjhUKv.jpg

after we rested and finished working on the pole that we had unloaded, all team members immediately moved to the next point where at the next point we had two tasks attached, the first thing we completed was the installation of motorized LBS or let's call it a transformer to make it easy understanding.

to install the transformer here requires three people who have to go up to the top of the pole and five people who control it from below because during this installation we can't work while turning off the electricity, even though the risk is big we still have to carry out this task.

after the installation of the transformer was completed, the crane truck immediately moved to the next point not far from the previous point, at this next point for us this is the easiest and easiest job because it only straightens the tilted pole and fixes the cable ties above pole, it only requires three workers, the others just need to wait downstairs and be ready to go to the next point.

https://files.peakd.com/file/peakd-hive/lea12/23sdhgqH28jiaU96rRZnAn4CmrEeZ7dotzoQ41NcXQzPXPs64VSsRaiJj8VQ635ynJBoR.jpg

this is where the work that we think is very easy but here it is different because there are so many cables that pass through or contact this one pole, to be safe this pole is not straight and has started to rust.

here we don't remove this pole right away because the stock of the new pole we brought has run out, our post is too far from this point, we only removed a few components that can be removed today so that when we come back tomorrow it won't take too much time .